Century City, CA  ~  Roofing for Posterity


Roofing Problem: Ownership was implementing a multimillion dollar building renovation including elevator and roof replacement. They wanted a long term roofing solution to replace the failed built up asphalt roofing.

Roofing Answer: We designed and specified polymer modified multiple layer roofing with urethane surfacing. The first layer of modified membrane roofing incorporated an integral layer of insulation and was mechanically fastened to the concrete deck. The second layer of APP modified membrane was heat welded over the mid ply then a full coating of urethane surfacing was applied and the walk pads embedded in the urethane.